Project P-01 · Sheet 1 / 1

IESO Clarkson – SCADA Replacement

Design-build for the IESO headquarters

COMMISSIONINGClient  IESO
  • HMI
  • ALM
  • SYNC
  • HIS
  • PRO
  • FLD
  1. 01 · Problem

    An outdated SCADA system

    The BMD and Mohawk team was the selected service provider for deploying and executing a complete design-build initiative to commission a new SCADA system that would replace the existing SCADA monitoring infrastructure for the IESO's Headquarters, powering the IESO Control Room.

    The team selected and designed a solution that uses Inductive Automation Ignition SCADA based on a comprehensive analysis of the IESO's specific requirements. This includes a single I/O nodes to consolidate the functions of the existing gateway from I/O boxes into modular nodes; redundant servers, configured as a warm-standby redundant pair; upgraded HMI that retains established single-line diagram, alarms and events, equipment status, and control workflows, while adding room-level detail, dynamic electrical section coloring, historical trends, and customizable charts; and cybersecurity and recovery provisions.

    A comprehensive implementation plan was developed, including pre-commissioning off-site setup and testing at Mohawk's lab facility to reduce installation troubleshooting and minimize commissioning downtime. The upgrade is intended to preserve existing monitoring and control functionality while improving system maintainability, operator visibility, and recovery capabilities.

  2. 02 · Approach

    Ignition Perspective, fed by the RTAC

    • I led the HMI design and built the application in Ignition 8.3 Perspective.
    • Data comes in from an SEL RTAC over DNP3 and drives single-line diagram displays with breaker control, alarming, a sequence-of-events log and historian trend charts.
    • Role-based access and audit logging; a shared SOE logging library; dynamic historian charts.
    • Redundant master/backup gateways with SQL Server historian storage.
  3. 03 · Stack

    What it runs on

    HMIIgnition 8.3 Perspective
    Field controllerSEL RTAC
    ProtocolsDNP3 · OPC UA
    HistorianSQL Server
    RedundancyMaster / backup gateway pair
    • HMI
    • ALM
    • SYNC
    • HIS
    • PRO
    • FLD
  4. 04 · Outcome

    Commissioning

    COMMISSIONINGDesign phase completed
FIG 1 Logical network diagram of the IESO Clarkson SCADA system.

Project data

Client
IESO
My role
HMI design lead
Platform
Ignition 8.3 Perspective
Data source
SEL RTAC
Protocols
DNP3 · OPC UA
Historian
SQL Server
Status
COMMISSIONING