IESO Clarkson – SCADA Replacement
Design-build for the IESO headquarters
Replacing the facility's outdated SCADA with an Ignition 8.3 Perspective system fed by an SEL RTAC over DNP3.
- HMI
- ALM
- SYNC
- HIS
- PRO
- FLD
Four pieces of work, each with an honest status.
Design-build for the IESO headquarters
Replacing the facility's outdated SCADA with an Ignition 8.3 Perspective system fed by an SEL RTAC over DNP3.
13-week Applied Research course project
Students build an Ignition 8.3 Perspective HMI for a simulated substation. I built the reference project, the assignments and the study plan.
OPAL-RT + HYPERSIM, into Ignition over DNP3
Real-time power system simulation on OPAL-RT with HYPERSIM, integrated with Ignition over DNP3.
Module capacity testing, HV pack assembly
Module capacity testing on a Chroma 17020, then HV safety training and pack assembly at Stellantis.